Mid Construction
click an image to enlarge
Alex Teshin measures where to put cross designs onto panels.
Dn. Elias and Alex lay down the cross design to go under the icons on the iconostasis.
Finished cross design before being stained.
Trim used to put around the main icons on the iconostasis.
Dave Harmer intalls a rosette used on the columns.
Alex begins to stain the iconostasis panels.
A view inside the alter after hardwood floors were installed.
Another view inside the altar.
Christ icon panel.
Iconostasis with Last Supper arch installed.
Cross and Corpse were completed in time for Good Friday of 2003.
Alex measures the post for our new sign.
The new church sign.
Back to Top