Early Construction
click an image to enlarge
Dave Harmer makes the first cut to raise the altar area.
Dn. Elias raises an electrical outlet to make room for the raised floor.
Nicolas Teshin harmers together the frame work for the floor.
Dn. Elias and Peter Shkabara lay down plywood subflooring.
The raised altar area is completed.
Peter Shkabara nails together the frame for the Iconostasis.
Making sure the frame doesn't fall.
Anchoring the Iconostasis to the wall.
A view into the altar area.
Iconostasis frame work is completed.
Back to Top